Home / Archive / VOL. IV NO. 28 12/15/2023 / Notes from Sewer and Water Commission, December 5. 2023, hybrid

Now we are seven and all systems are go. Click http://www.stockbridgeupdates.com and in upper right corner, subscribe or leave us a comment. Find our complete archive from the first issue in August 2020 through April 15, 2026. Search an old article, read or reread them, and of course, take another look at all those fabulous photographs. if you would like to support Stockbridge Updates, go to VENMO @carole-owens-6 (no caps) or mail a check to P. O. Box 1072, Stockbridge, MA. 01262. If you like this issue, pass it on.

Notes from Sewer and Water Commission, December 5. 2023, hybrid

Camp Mahkeenac and Lake Drive Association were both present to inquire about the Sewer Master Plan. When will it be done? Where will the sewer be extended and when. The Camp is facing an issue very soon and would prefer to spend money to connect to Town sewer rather than building separate sewage plant (septic system).

Apparently, there will be a report (final or preliminary?) in January.


Photo: Blue Moon Images/Dana Goedewaagen.

Sign Up for 
Stockbridge Updates

Name

Past Issues

Archive of all stories